Every day a restaurant is not open is a day of rent without revenue. Electrical work sits on the critical path of almost every buildout, which makes it one of the most common reasons an opening date slips. The good news is that the delays are usually preventable.

Confirm service capacity early

Commercial kitchens carry heavy loads. If the existing service cannot support the equipment, that becomes a service upgrade with utility lead time. Finding this out in week one is manageable. Finding it out in week six is a problem.

Coordinate the equipment cut sheets

Every piece of kitchen equipment has specific power requirements. Getting the cut sheets early lets the electrician rough in the right circuits the first time instead of reworking them later.

Sequence with the other trades

Electrical rough in has to happen before walls close, and trim out has to follow the finishes. Tight coordination with the general contractor and the other trades keeps everyone moving.

Build in inspection time

Inspections take time and sometimes require corrections. Leaving a buffer before the planned opening keeps a failed inspection from blowing the date.

BeaconVolt has built out restaurants across South Florida, from national franchises to independent concepts, and we are structured for the speed an opening date demands.

Banner Image
Contact Us

Let Us Power Your
Next Project.

Let us Power Your Business

Request a Bid

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.